Earlier coverage: Second Street bridge awaited final inspection
Update, November 17: The Second Street bridge and exit ramp have reopened. This earlier report described the inspection still pending before reopening.

UPDATE, NOVEMBER 17, 2026: The Second Street bridge and exit ramp are now open to the public, according to WDTV, citing city officials. The original report below described conditions before the reopening.
Clarksburg’s Second Street bridge is moving toward reopening, with reconstruction complete and final inspection work still ahead, according to a November 13 report by WV News.
State highway officials told the outlet that crews were removing traffic controls from U.S. Route 50. The bridge ramps were to remain closed until engineers finished the inspection and outstanding items were addressed.
The report did not establish a firm reopening date. It described the connection into downtown as potentially reopening in the coming weeks.
WV News reported that the project had been delayed by an alignment problem discovered during construction. The bridge was damaged in 2023 when an excavator being hauled beneath it struck the span.
Sources & further reading
WV News, reporting by Damian Phillips ↗WDTV, November 17, 2026 reopening update ↗See something that needs a correction?
Include the article title and the specific information we should check.
Continue the Conversation
Have something to say about this story? Join the discussion in our Clarksburg News and Observer Facebook community.
Visit Our Facebook GroupCommunity comments are participants’ views and are not verified Observer reporting.